
Published project details
- Installation
- 215 kWh Industrial Battery
- Area
- Factory in Heraklion
- Operating type / storage
- Energy storage installation
Project description
This installation is included in the published Green Action Energy portfolio. The photograph and the location, capacity and operating description above reproduce that public record.
Design considerations for a similar installation
For a similar storage installation, assess daytime surplus, later demand and the required charge/discharge power. Backup is a separate capability that requires an appropriate electrical arrangement; battery capacity alone does not establish it.
Equipment and results
Panel and inverter models, detailed commissioning records and measured production or financial results have not been published for this entry. No brand, savings figure or payback period is inferred. Historical Net Metering labels describe the recorded installation and do not establish current eligibility for a new connection.
Related services
Discuss your installation
Send your location, bills, operating hours and available roof space for an individual assessment.
Request an assessment