Green Action Energy's published office is at 60 Kalokairinou Avenue, Heraklion. A solar assessment starts with your property's demand, operating hours, available space and objectives for self-consumption or backup.
Urban rooftops and commercial premises
On an urban building, nearby obstacles, parapets, access and switchboard location need assessment. Larger business installations also require analysis of simultaneous loads, shifts and installation scheduling around daily operations. Decisions follow site conditions and measured demand, not the postcode alone.
Published projects in the Heraklion area
- 350 kW industrial solar in Profitis Ilias.
- 10 kW solar with 10 kWh storage in Anissaras.
- 10 kW off-grid solar with storage in Zaros.
These records illustrate different applications. A nearby project does not establish the right size for another property.
Options for different needs
For homes we compare daylight production with evening demand. For businesses we assess weekly and seasonal operations. Net Billing and storage options should use consistent assumptions so quotations remain comparable.
Heraklion questions
Can an initial assessment happen before a visit?
Bills, photographs and roof dimensions support an initial discussion. The final technical proposal requires inspection of actual conditions.
Does a nearby installation guarantee a connection?
No. Availability and conditions must be checked for the particular supply and application.
What is needed to add storage?
The inverter model, operating data, equipment space and intended use. A storage retrofit is assessed as a change to the whole system.

Discuss your installation
Send your location, bills, operating hours and available roof space for an individual assessment.
Request an assessment