Green Action Energy assesses commercial PV using schedules, loads, installation space and electrical infrastructure. A proposal links generation to operating needs and states its assumptions.
Industry and business loads
Record shifts, simultaneous power and critical systems. Assess Net Billing and Zero Feed-In, industrial storage and separately UPS where continuity is required. Published references include the 350 kW Profitis Ilias plant and 215 kWh Heraklion battery.
Hotels and seasonal properties
Occupancy, cooling, pumps and season length determine how output is used. The hotel PV guide explains preparation. The portfolio includes a 10 kW hotel installation in Zaros.
Agricultural operations
Pumping, irrigation and refrigeration require assessment of seasonality, starting currents and continuity. Read the agricultural applications guide before gathering information. No undocumented agricultural project is presented as a customer reference.
From assessment to handover
- Record demand and site constraints.
- Compare array size and storage options.
- Check applicable connection and technical requirements.
- Specify equipment, work scope and tests.
- Deliver documentation and agreed monitoring access.
Preparing a quotation request
Provide twelve months of consumption, operating hours, supply details, usable area and expansion plans. Cost and schedule are finalised after assessment. Neither a grant nor guaranteed payback is assumed.
Discuss your installation
Send your location, bills, operating hours and available roof space for an individual assessment.
Request an assessment