Skip to content
Loading

This page brings together service areas and portfolio applications across Crete. Visit Green Action Energy for the company overview, or choose a dedicated service for detailed design criteria.

Choose an installation area

The portfolio also contains records from Sisi, Lasithi. Location informs design and scheduling; connection availability is always checked for the particular supply.

Different needs on the same island

A permanent home, hotel and industrial site do not share the same schedule or backup needs. Compare residential solar, commercial systems, storage and off-grid solutions against actual use.

Published references

The 12 project records cover PV, storage and autonomous applications. Individual pages distinguish public facts from unpublished details such as equipment models or measured financial results.

Crete installation questions

Is there one annual yield per kW for all of Crete?

No. Location, orientation, shading and losses change the result. See how production is estimated.

Which technology fits my situation?

Start with grid availability, schedules and objectives. Net Billing and off-grid designs address different conditions.

What should I provide initially?

Area, bills, major loads, site photographs and storage or backup objectives. Exact property records and personal documents are exchanged only when required for the process.

5 kW solar PV system with 5 kWh battery storage in Sisi, Lasithi
5 kW Solar PV with 5 kWh Battery · Sisi, Lasithi

Discuss your installation

Send your location, bills, operating hours and available roof space for an individual assessment.

Request an assessment