This page brings together service areas and portfolio applications across Crete. Visit Green Action Energy for the company overview, or choose a dedicated service for detailed design criteria.
Choose an installation area
- Heraklion: the published office and installations at different scales.
- Chania: commercial applications and the Paleochora reference.
- Rethymno: existing buildings and upgrade assessment.
The portfolio also contains records from Sisi, Lasithi. Location informs design and scheduling; connection availability is always checked for the particular supply.
Different needs on the same island
A permanent home, hotel and industrial site do not share the same schedule or backup needs. Compare residential solar, commercial systems, storage and off-grid solutions against actual use.
Published references
The 12 project records cover PV, storage and autonomous applications. Individual pages distinguish public facts from unpublished details such as equipment models or measured financial results.
Crete installation questions
Is there one annual yield per kW for all of Crete?
No. Location, orientation, shading and losses change the result. See how production is estimated.
Which technology fits my situation?
Start with grid availability, schedules and objectives. Net Billing and off-grid designs address different conditions.
What should I provide initially?
Area, bills, major loads, site photographs and storage or backup objectives. Exact property records and personal documents are exchanged only when required for the process.

Discuss your installation
Send your location, bills, operating hours and available roof space for an individual assessment.
Request an assessment